Series 6850 Hydropak HM Sets PDF Installation Operation and Maintenance Manual

PREFACE
1. The microprocessor controllers are designed for ease of setting and operation. Access to information and the setting parameters has been made quick and simple by dividing the main menu into four segments ALARMS, HOURS RUN, PUMP TEST and PARAMETER SET UP.
2. All packaged pump systems are pre-wired and fully tested, both hydraulically and electrically prior to dispatch.
3. All parameter data has been entered into the controller in accordance with the system criteria. Once on-site connections have been made, and all pre-checks carried out the system is ready to operate.
4. If during commissioning, system conditions are found to vary from those set out in the design criteria, the parameters can be easily changed. (See parameter set up).
5. The Microstar 2000 Controller Operating Instructions describe the ease of pump set-up operation and adjustment for Multi-pump packaged sets.
INTRODUCTION
1. This leaflet contains specific information regarding the safe installation and operation of the Microstar 2000 controlled packaged sets. These instructions must be read and understood by any one responsible for the installation and maintemnance of this equipment.
2. When a pump set leaves the factory, it will be set so all pumps are in the ‘AUTO’ position on initial power up.

3. Prior to power being applied, it is essential that all precommissioning procedures are carried out in full.
4. Operation and maintenance instructions for the StarpaHM 2000 should be read in conjunction with thes Multi-pump Controller Operating Instructions.
5. Operators and installers must familiarise themselvewith the operation and controls of the equipment.